Debris rack study ongoing

Debris rack study ongoing

In 1975, a concrete debris rack spanning the width of Doan Brook was installed at the western end of the Gorge, 90 feet upstream from the Martin Luther King, Jr. (MLK) Drive bridge culvert. The rack was installed after several large floods inundated downstream...